LIVE: Badwell Ash – Suffolk
Executive Summary
Badwell Ash is located in Suffolk and is a 2 storey house and garage project built using Thermohouse ICF.
Our Client just returned from abroad and wanted an energy efficient house in a picturesque corner of Suffolk.
The ground floor has an area of about 350 sq/m.
How Thermohouse Helped
Thermohouse UK use a team of experts and specialised installers for this rapid build project. Our technical team are available throughout the process to offer any guidance that is required, ensuring a streamlined building process.
Thermohouse have made great progress with the main house shell built in 10 weeks, plus rapid progress on a separate double garage with a studio space on top.
For this project we used our 160mm Thermofloor panels for the 1st floor slab.
350 sqm of external walls using the 300mm external Thermowall block
150 sqm of internal 250mm Thermowall block
360 sqm of our Thermoroof panels acting as the slopped roof over 1st
Garage
100 sqm of external walls in our 300mm external Thermowall block
20 sqm of internal 250mm Thermowall block
50 sqm of Thermofloor
100 sqm of our Thermoroof panels acting as the slopped roof over 1st
Structural Engineer: Paudie O’Connor for Thermohouse UK Ltd
Architect: Richard Hall for Arc8 Architects
Building Contractor: Thermohouse UK Ltd
KeyPoints | |
Location: | Suffolk, UK |
Building Type: | 2 storey house & garage |
Size: | 350 sq/m house & 100sq/m garage |
System Components: | thermowall thermoroof thermofloor |